- +91 8291375637
- info@wavetechs.com
Electrical panel manufacturing: designing, assembling, testing
Read MoreElectrical installation and commissioning set up and test electrical systems for safety
Read MoreAutomating tasks with tech uses sensors, programming, and data analysis to boost productivity and cut costs in all sectors.
Read MoreElectrical AMC: Inspections, Maintenance, Emergency Services, and Cost Savings
Read MoreImproved electrical efficiency with APFC systems - saving energy, avoiding penalties
Read MoreRetrofitting upgrades existing systems for better performance, replacing parts or adding features.
Read MoreMain LT Panel
PCC Panel
MCC Panel
AC/DC Distribution Board
STP Panel
Fire Fighting Panel
Duct Heater
APFC Panel
Bus Duct
AMF Panel
ATS Panel
Feeder Pillar Panel
Electrical Junction Box
AHU Panel (DOL/Star Delta)
VFD and Soft Starter Panel
Customized Control Panel
PLC Control Panel
Industrial Automation
APFC panel
Power Factor Correction
Fast response time refers to the amount of time it takes
Fast response time refers to the amount of time it takes
Fast response time refers to the amount of time it takes
Fast response time refers to the amount of time it takes
Fast response time refers to the amount of time it takes
Fast response time refers to the amount of time it takes
They took the time to understand our specific needs and design a solution that perfectly suited our requirements. The quality of the workmanship was exceptional, and the panel has been operating flawlessly since installation.
The quality of the control panel was outstanding, built with precision and attention to detail. Since its installation, our operations have become more efficient and reliable, thanks to the panel's seamless performance.